Sunday, February 10, 2008

Rear coming together

The Oasis compressor mount has been tacked into place and it all seems to fit snug in place. First battery trey is in place. I picked up these pre fabed ones from Sumit Racing.Both battery treys in place. Everything so far seems to fit really tight but that is the effect we are going for tight and clean.Going to have to get a new Sir Michaels roll pan to fit the extra inch and a half. I will let the body shop handle the drop plate idea.The Swag Loks will recess a bit further back into the tank giving the extra few millimeters need for space.
The back of the bed should cover all of this up. The factory spare tire sat in the same space and droped just as much, we should see nothing unless you get under the truck. Here are a few more pictures from different angles.On my previous setup the pressure switch was an industrial one which basically was overkill. We will mount that switch on the tank that way this is all that will stick about the frame. As you can see the C notch bracket from ART sticks up just as high.

This week I want to get most of all the suspension stuff on order. I will post up all the stuff we will be getting.












No comments: